Polycom DOC2231A Manuale Utente Pagina 16

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 116
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 15
Chapter 2 - Hardware Installation
2-4
Unpacking and Positioning the MGC+100
To unpack and position the MGC+100:
1. When you receive your MGC+100, inspect the equipment for damage
and verify that the components match the packing slip. If you did not
receive a component or if there is damage to the system, notify your
service representative immediately.
Figure 2-1: MGC+100 package
2. Place the MGC+100 unit on a stable flat surface in a location that meets
the MGC+ environment requirements, which are:
Operating temperature: 10°–40°C (50°–104°F) or 10°–35°C
(50°–95°F) when installed in a 19” rack
Humidity: 15%–90% non-condensing
Altitude: Up to 3,000m (10,000ft)
ESD: +8 kV
Carrying Strap
Lock in O
p
en Position
Wood Packing
C
ase
Lock in Closed Position
Vedere la pagina 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 115 116

Commenti su questo manuale

Nessun commento